Agilitus QLD was awarded the concept to detailed design package of the new NPI facilities as part of the Ravenswood Expansion Project.
The scope of work included engineering and designing all disciplines within the facilities including procurement activities and workshop fabrication packages. Facilities included heavy vehicle workshop, heavy and light vehicle washdown facility, tyre change; diesel unloading, storage and dispensing; warehouse and mine operations facility; dangerous goods store; and all services (water, air, electrical).
The Ravenswood Gold Mine is situated in the northeast region of Queensland, Australia. It is located approximately 130 kilometres south of Townsville and about 90 kilometres east of Charters Towers. The mine is the largest gold mine in Queensland, with an estimated 4 million ounces of gold to be extracted over the next 14 years of its lifespan.