Agilitus was engaged to undertake lifting, transportation and temporary works design of the modular steel structures.
The project involved construction of a road receival hopper, a rail receival facility, an elevated overland in-loading conveyor system
Our Energy Innovation team has determined the overall energy and power demand for the new infrastructure planned for Berth 3.
We have been instrumental in the expansion of Roy Hill’s Stanley Point 3 – part of the Port of Headland – delivering three studies including the Expansion Feasibility Study.