The project involved construction of a road receival hopper, a rail receival facility, an elevated overland in-loading conveyor system
Agilitus developed an award-winning innovative solution that incorporated offering up a large concrete and steel isolation frame to the underside of the existing floor and mounting it on air springs.
Dampier Salt engaged Agilitus for professional engineering consultancy to conduct a Surface Water Management Order of Magnitude Study (OoM)
Mine site infrastructure project consisting of heavy vehicle workshop, ore-handling plant workshop, HV & LV wash-down, sample-prep laboratory and minor buildings.