426MLLHR Grade Separation

Engaged by Rio Tinto Iron Ore, with Main Roads WA as the end user, our team led the detailed design of a critical infrastructure upgrade to eliminate a high-risk rail crossing on the Great Northern Highway. The solution included a 42.5m skewed Teeroff bridge over live rail, 8km of highway realignment, major intersections and supporting infrastructure.

This project reflects our ability to deliver complex, multi-disciplinary infrastructure that meets client goals, regulatory standards, and operational needs while driving value at every stage.

What sets this project apart is how our team:

  • Adapted to inherited design challenges, reworking a non-conforming reference design to meet funding and stakeholder requirements.
  • Optimised capital expenditure, developing dual foundation options and a robust execution strategy that balanced cost, risk, and constructability.
  • Challenged conventional standards, working with Main Roads WA to reduce earthworks, minimise environmental impact, and deliver a safer, more efficient design.
  • Managed scope and schedule pressures, streamlining intersection geometry and design boundaries to avoid unnecessary cost and disruption.

“The Agilitus team has consistently demonstrated a high level of dedication throughout the 426MLLHR Grade Separation project. Their technical capabilities, responsiveness, and adaptability have been outstanding. From detailed cost forecasting to timely reporting and schedule management, the team has gone above and beyond to meet project milestones. We’ve been extremely pleased with their performance and would gladly recommend them for future infrastructure projects.”

Delan De Silva, Project Lead – Rio Tinto