Process Engineering Support for SO4 Lake Way

SO4 has partnered with Agilitus to provide Process Engineering support at the Lake Way Project in Wiluna, SO4’s first producing asset of Sulphate of Potash (SOP). Once fully ramped up, Lake Way will deliver 245,000 tonnes per annum of premium SOP, establishing SO4 as a key supplier to the global fertiliser market. As part of this engagement, Agilitus has embedded senior process engineers directly within SO4’s operations, enabling close collaboration and fast, informed decision-making. This includes:

  • Optimising and operating solar evaporation ponds for maximum performance.
  • Developing sustaining capital works to enhance pond reliability.
  • Designing targeted processing plant upgrades, including the reverse flotation module changeout.
  • Managing construction and commissioning of plant upgrades with minimal disruption.
  • Supporting the process plant ramp-up to safely achieve nameplate capacity.

This hands-on partnership continues to ensure SO4 benefits from Agilitus’ responsive, fit-for-purpose engineering approach helping accelerate ramp-up, optimise operations, and unlock the full potential of Lake Way.

“What sets our Process team apart is where we influence those outcomes. The flowsheet is where we determine how the plant will fundamentally operate and that shapes everything that follows: the equipment, the layout, the structures and the ongoing operating costs.

Strong early decisions benefit the entire project, which is why we embed with our clients from the study phase – and stay with them through ramp-up and commissioning to reach their plant’s optimum name plate throughput – drawing on the overall expertise of the team.”

Sebastien Nalletamby – Senior Project Manager

Process Capability Statement

Next edition

IGNITE available now