Projects

Explore Agilitus projects in Resources, Energy & Industry, from design & EPCM to ESG and rehabilitation, delivering impact with competence and commitment.

Our Projects

We provide multidisciplinary fit-for-purpose design, engineering, EPCM, rehabilitation and ESG capabilities across the full project life to help our clients realise their development vision. in the Resources, Energy and Industrial sectors. This includes mitigating risk, improving safety, minimising operational disruptions, optimising asset performance, connecting to infrastructure and freight networks, navigating through statutory approvals, enhancing their social license to operate, making projects bankable and increasing value for all stakeholders.

  • Eldo Plateau Haul Road PFS Waterways

    Eldo Plateau Haul Road PFS Waterways

    Rio Tinto Gove Operations require a haul road and a public access road to be constructed by 2022 to safeguard the mines throughput target of 13.0 Mtpa.

    Read More

  • Gudai Darri SMP Transportation Steel

    Gudai Darri SMP Transportation Steel

    Agilitus was engaged to undertake lifting, transportation and temporary works design of the modular steel structures.

    Read More

  • Parkes Terminal Facility

    Parkes Terminal Facility

    As lead design consultant for the brand-new freight facility with container storage, rail sidings, heavy vehicle access roads and direct interface to the first stage of ARTC’s Inland Rail.

    Read More

  • Roy Hill Ultrafines Stage 2

    Roy Hill Ultrafines Stage 2

    The Roy Hill Ultrafines Stage 2 Project forms part of Roy Hill’s project pipeline to identify recovery improvement and expansion projects to be able to consistently achieve the approved export capacity of 60Mtpa.

    Read More

  • API Hub to Mulga Downs PFS Cost Study

    API Hub to Mulga Downs PFS Cost Study

    Agilitus is currently undertaking a PFS for Roy Hill for a heavy haul rail transportation option linking the API Hub to the proposed Mulga Downs mine.

    Read More

  • RGP Rail Bridge Detailed Waterways

    RGP Rail Bridge Detailed Waterways

    Agilitus was commissioned to conduct a detailed waterways analysis of 12 rail bridges as part of BHPBIO’s RGP5 rail upgrade between Newman and Port Hedland in the Pilbara region of Western Australia.

    Read More

  • Syama Roaster Shutdown

    Syama Roaster Shutdown

    Agilitus assisted with the shutdown works where Resolute require structural engineering services for rigging design, development of materials movement plans and laydown areas assessment

    Read More

  • MAC Minewater Tank Duplication

    MAC Minewater Tank Duplication

    The key objective of this tank duplication project was to provide duplication of the current storage and pumping system to mitigate the risk to the BHP MAC plant of being reliant on a single system regarding the plant and fire water supply.

    Read More

  • BHP Jimblebar NPI Buildings

    BHP Jimblebar NPI Buildings

    Mine site infrastructure project consisting of heavy vehicle workshop, ore-handling plant workshop, HV & LV wash-down, sample-prep laboratory and minor buildings.

    Read More

  • Mount Morgans Primary Crusher Vibration Assessment

    Mount Morgans Primary Crusher Vibration Assessment

    Shortly after commissioning of the Mt Morgan’s Gold Mine, several failures of structural elements were identified at the crushing facility.

    Read More

Client : Rio Tinto
A global mining giant engaged us to undertake a decarbonisation study to demonstrate reduced operating costs, reduced risk and reduced Read more
Client : Rio Tinto
Agilitus recently completed on-site construction support services for Rio Tinto Iron Ore at the White Quartz Road Realignment situated at Read more
Client : Rio Tinto
Agilitus developed an award-winning innovative solution that incorporated offering up a large concrete and steel isolation frame to the underside Read more
Client : Roy Hill
We have been instrumental in the expansion of Roy Hill’s Stanley Point 3 – part of the Port of Headland Read more
Client : Roy Hill
To maintain required production levels, Roy Hill required a new crushing facility 6km from the existing infrastructure. Read more
Client : Central Systems for FMG
We have worked collaboratively with Central Systems and Fortescue to deliver concrete and steel plate arch structures at Cloudbreak. Read more
Client : Roy Hill
We are providing Early Engineering works to enable the electrification of Fortescue’s mining equipment and assets across its Australian iron Read more
Client : Rio Tinto
We completed on-site construction support services for the White Quartz Road Realignment. Read more
Client : BCI Minerals
We have supported BCI Minerals Limited in its development of the Mardie Salt and Potash Project, a sustainable opportunity to Read more